We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

RE:[sap-basis] Upgrade to ECC6.0 with EhP4

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by oxi1992(Basis Consultant)
on 07/23/2009 02:41:00 PM

Thanks, There was one error in the trusted RFC destination meant for the satellite system in the SolMan system (authorization test not working though the connection test was working) - May be that's what was causing the xml file not generating in step 2.5 (confirm files).
- fixed using an authorized error from satellite system
I see now 3 files under /usr/sap/trans/EPS/in:
SMSDXML_<SID>_<datetimestamp.<number>.txt
SMSDXML_<SID>_<datetimestamp.<number>.xml
SMSDXML.xml
I am assuming the 2nd one (with higher byte size and contents) is to be used.
1. Does it need to be renamed to some other name (ASU.XML or something) so PREPARE can use it?
2. Do we need to extract the contents from SR1 EHP1 CDs into EPS/in or use them to input as mount points in PREPARE input phase?
Thanks,
Oxi
__.____._

Copyright © 2009 CEB Toolbox, Inc. and message author.

Toolbox.com
4343 N. Scottsdale Road
Suite 280
Scottsdale, AZ 85251

0 comments:

Post a Comment

T r a n s l a t e to your language