RE:[sap-basis] Upgrade to ECC6.0 with EhP4
Posted by
Admin at
|
Share this post:
|
on 07/23/2009 02:41:00 PM
Thanks, There was one error in the trusted RFC destination meant for the satellite system in the SolMan system (authorization test not working though the connection test was working) - May be that's what was causing the xml file not generating in step 2.5 (confirm files).
- fixed using an authorized error from satellite system
I see now 3 files under /usr/sap/trans/EPS/in:
SMSDXML_<SID>_<datetimestamp.<number>.txt
SMSDXML_<SID>_<datetimestamp.<number>.xml
SMSDXML.xml
I am assuming the 2nd one (with higher byte size and contents) is to be used.
1. Does it need to be renamed to some other name (ASU.XML or something) so PREPARE can use it?
2. Do we need to extract the contents from SR1 EHP1 CDs into EPS/in or use them to input as mount points in PREPARE input phase?
Thanks,
Oxi __.____._
Toolbox.com
4343 N. Scottsdale Road
Suite 280
Scottsdale, AZ 85251
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion