Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from stcraig44 on Nov 7 at 4:38 PM Lot control addresses this at a certain level that may be enough. Do you also need to manage costs and are they the same for all these materials? Do they have different lead times that are significant? A given material can only have one planning lead time and one current cost. The inventory can be managed with lot numbers and you could use characteristics to reflect cost and with some effort have things calculated correctly. Planning lead times are generic and standard so some thought is needed in setting lead time. Hope this helps.
| | | ---------------Original Message--------------- From: twalls-c2 Sent: Monday, November 07, 2016 4:19 PM Subject: Material Codes For Same Generic Materials Hi Rakesh, Can you use lot control to discriminate among the suppliers for the material? | | Reply to this email to post your response. __.____._ | In the Spotlight Become a blogger at Toolbox.com and share your expertise with the community. Start today. _.____.__ |