Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from yasnajm on Jan 6 at 1:19 PM change the call horaizon to 96% in maintenance plan and schedule it by using ip10 with restart or start in cycle which will ask to delete the existing order. so that you can proceed further.
| | | ---------------Original Message--------------- From: Pelle Sent: Monday, November 16, 2015 8:00 AM Subject: What will happen when i change call horizon for an order thats already created. I want to change the call horizon for re occuring tasks since its a bit to long "heads-up" du to a to low call horizon. The cycle is 75 weeks and had 80% call horizon. i want it changed to 96%. This is a bit of a special case, there are 150 individual plans that is practicly the same in our system, but it points to an individual unit that has a modular maintenance so there are long cycles but 2 workordes (AC01) generated each weak, And the system generats an (AC04) refurbish workorder for each of those AC01. think that this is a special feature in our system. My question is if i change the call horoizon for a plan that have been generated by the system today (with 80% call horizon) to 96% instead (that call horizon havent occured yet). Will the system generate a new AC01 and AC04 when call horizon is passed ? On the other hand. If i delete the existing AC01 and AC04 that been created with 80% call horizon. Will the system generate the same workorders ones again since they dont exist in the system. Or will it wait until the call horizon of the next cycle occurs ? Thanks . //Pelle | | Reply to this email to post your response. __.____._ | _.____.__ |