Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Question from leancon on Jul 28 at 4:18 PM Have an inspection lot that was created by the system when the Inspection type was activated and the Activate despite Inspection box was checked. Some how 2 inspection lots for the same batch/serial number combination were created. One lot was processed but I need to cancel or get rid of the other one. how can I do this? | Reply to this email to post your response. __.____._ | | leancon Business Operations Administrator | | _.____.__ |