Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from shaunak kulkarni on Sep 20 at 6:16 AM Think User exit might not be required. Check the Pricing type field at item level is set to D or not. D is meant for copy pricing data unchanged at item level. Also check box of the copy schedule line should be marked active.
| | | ---------------Original Message--------------- From: Shaun Asbury Sent: Wednesday, September 17, 2014 8:45 AM Subject: Copy Control, Quote to SOrder, non-schedule line to schedule line of Sales Order Hi Experts, We are trying to create a Sales Document from a Quotation. The Quotation has a main line with a Discount Condition on it. When the Sales Order is created, we want copy control to copy the discount from the Quotations' main line to the Sales Orders schedule lines. Then rules-based ATP function replaces ZTAN with ZAPA, and creates sub-item with category ZLES. ZTAN has pricing indicator TVAP-PRSFD = 'X' (ie. the system automatically carries out pricing at item level), but ZAPA has TVAP-PRSFD blank (ie, Pricing is not carried out on the ZAPA item) Since ZTAN and ZAPA have different TVAP-PRSFD, the system runs new pricing with type 'B Redetermine pricing', losing the manual condition ZGDV. We however have implemented the exit userexit_new_pricing_vbap to overcome this. But now the main item on the Sales Order contains the discount, but none of the schedule lines do. We are not sure where the logic needs to be put to ensure that the pricing is copied from the original ZTAN directly to the ZLES item. | | Reply to this email to post your response. __.____._ | _.____.__ |