Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from KayBR on Sep 19 at 3:16 PM In the definition of the order header, set the On/off switch for emssages abut quotations to either B, D, or F. Then make sure your item category ZLES is relevant for pricing and that should take care of it.
| | | ---------------Original Message--------------- From: Shaun Asbury Sent: Wednesday, September 17, 2014 8:45 AM Subject: Copy Control, Quote to SOrder, non-schedule line to schedule line of Sales Order Hi Experts, We are trying to create a Sales Document from a Quotation. The Quotation has a main line with a Discount Condition on it. When the Sales Order is created, we want copy control to copy the discount from the Quotations' main line to the Sales Orders schedule lines. Then rules-based ATP function replaces ZTAN with ZAPA, and creates sub-item with category ZLES. ZTAN has pricing indicator TVAP-PRSFD = 'X' (ie. the system automatically carries out pricing at item level), but ZAPA has TVAP-PRSFD blank (ie, Pricing is not carried out on the ZAPA item) Since ZTAN and ZAPA have different TVAP-PRSFD, the system runs new pricing with type 'B Redetermine pricing', losing the manual condition ZGDV. We however have implemented the exit userexit_new_pricing_vbap to overcome this. But now the main item on the Sales Order contains the discount, but none of the schedule lines do. We are not sure where the logic needs to be put to ensure that the pricing is copied from the original ZTAN directly to the ZLES item. | | Reply to this email to post your response. __.____._ | _.____.__ |