Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from Patze1980 on Sep 12 at 3:03 AM Hi, Please check material master settings for quality management. Depending on the inspection type materials will be posted into Q stock and IL (Inspections Lots) will be created. Relevant Inspection Type should be 03 - "In-process insp. for production order". I hope this helps. Best Regards, Patrick
| | | ---------------Original Message--------------- From: Eric_C Sent: Monday, August 25, 2014 12:25 PM Subject: Production Order Builds Stock With Special Indicator Q, Production Order is created on MFG plant as the result of demand being created from an STO linked to a PS Project WBS. The MFG plant and Project are assigned to different Profit Centers. All the goods issues, WIP and variance postings for the prod order post to the profit center of the prod order. However, when the prod order is confirmed and the material is posting to inventory as Q-stock, the profit center of the Project (WBS element) is posted. Is this normal because the Production Order is building Q-stock? | | Reply to this email to post your response. __.____._ | _.____.__ |