Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Reply from nino_prodigio on Feb 9 at 2:38 AM Let me ask it another way then. If it is possible to produce more than one product in a specific cost center; then how could their costs be calculated separately since we check costs with transaction code "S_ALR_87013611 - Cost Centers: Actual/Plan/Variance" which based on cost center. In this way, there will be two different products in one cost center and their costs will be calculated together, so we won't be able to figure out exact cost of each products. Thanks.
| | | ---------------Original Message--------------- From: nino_prodigio Sent: Wednesday, February 08, 2012 3:39 AM Subject: How to Do Product and Cost-Center Match? Hello, We calculate product cost on the basis of cost center. This means that a cost center only belongs to a single specific product ? In another saying, only a single product can be produced at one particular cost center, correct ? Thanks a lot. | | Reply to this email to post your response. __.____._ | _.____.__ |