[sap-acct] Project Stock Do not Valuate With Standard Cost

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by nipink (SAP Consultants)
on Jun 4 at 7:57 PM
Hi All

I have a Material- A

Strategy group 10
Individual/coll. Blank
Prc. Ctrl S

I need to Produce this Material A for a Project. I have below Parameters With the Material A attached to the Activity of the Project

Acct Assgt Cat. Q
Special Stock Q
Valuation M

I ran MRP and created a Production Order and did the confirmation. But the Stocked Qty did not valuate with Standard Cost. I checked table QBEW it has a different value than Standard this value is equal to Target Cost/Confirmed Qty.

I checked " Without Val Strategy" in Retirement Class Customizing and created another Production Order for Material Number B and followed the Same Process It did not work either still the Sock do not get valuated with Standard cost.

Could someone tell me what do I need to do to valuate Project Stock With Standard Cost
Pls Note We have Mat Leger Active

Thank You
__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this online
  
_.____.__

0 comments:

Post a Comment

T r a n s l a t e to your language