Hi All I have a Material- A Strategy group 10 Individual/coll. Blank Prc. Ctrl S I need to Produce this Material A for a Project. I have below Parameters With the Material A attached to the Activity of the Project Acct Assgt Cat. Q Special Stock Q Valuation M I ran MRP and created a Production Order and did the confirmation. But the Stocked Qty did not valuate with Standard Cost. I checked table QBEW it has a different value than Standard this value is equal to Target Cost/Confirmed Qty. I checked " Without Val Strategy" in Retirement Class Customizing and created another Production Order for Material Number B and followed the Same Process It did not work either still the Sock do not get valuated with Standard cost. Could someone tell me what do I need to do to valuate Project Stock With Standard Cost Pls Note We have Mat Leger Active Thank You | __.____._ Copyright © 2011 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | _.____.__ |