RE:[sap-hr] Overtime calculation In Time Evaluation.
Posted by
Admin at
Share this post:
|
1 Comments
Posted by JG-SAPHR (Senior SAP HR Consultant) on May 22 at 9:33 AM | Mark as helpful |
Hi Aaditya
In TM00 schema check if there is a line to generate ZL or ZML entry for the processing type of the OT time pair.
If so, then run the TM00 for the OT date with log. Check the all the rule no. entries in the log for that proc.type. You can find where the problem is.
Hope this helps
Regards, JG
---------------Original Message---------------
From: aaditya bhatt
Sent: Saturday, November 29, 2003 8:23 AM
Subject: Overtime calculation In Time Evaluation.
> hi
>
> I am running time evaluation with Schema TM00, I can run the evaluation successfully, but the overtime calculation is not populated i.e. Table ZML and ZL are not updated.
> It calculates the overtime but is getting populated in Flexitime(instead of overtime)
>
>
> Time management status in IT 0007 is 1.
> I have uploaded the data from CATS to IT 2002 and updated the IT 2011 too.
> I have checked the table T510s also.
>
> Can any one guide me where i may be missing the point.
> or how can i run time evaluation.
>
> thanks in advance.
>
> Regards
>
> Aaditya
>
>
>
> Aaditya Bhatt
> cell:+91 98251 32259
> http://www.geocities.com/aaditya_b/myspace.html
__.____._ In TM00 schema check if there is a line to generate ZL or ZML entry for the processing type of the OT time pair.
If so, then run the TM00 for the OT date with log. Check the all the rule no. entries in the log for that proc.type. You can find where the problem is.
Hope this helps
Regards, JG
---------------Original Message---------------
From: aaditya bhatt
Sent: Saturday, November 29, 2003 8:23 AM
Subject: Overtime calculation In Time Evaluation.
> hi
>
> I am running time evaluation with Schema TM00, I can run the evaluation successfully, but the overtime calculation is not populated i.e. Table ZML and ZL are not updated.
> It calculates the overtime but is getting populated in Flexitime(instead of overtime)
>
>
> Time management status in IT 0007 is 1.
> I have uploaded the data from CATS to IT 2002 and updated the IT 2011 too.
> I have checked the table T510s also.
>
> Can any one guide me where i may be missing the point.
> or how can i run time evaluation.
>
> thanks in advance.
>
> Regards
>
> Aaditya
>
>
>
> Aaditya Bhatt
> cell:+91 98251 32259
> http://www.geocities.com/aaditya_b/myspace.html
Copyright © 2010 Toolbox.com and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Related Content
In the Spotlight
_.____.__ White Papers
In the Spotlight
Your SAP Security is at Risk...Learn How to Stay Protected. Read the free white paper from SenSage