RE:[sap-log-ps] Create multiple line items in AUC after running settlement from WBS element.
Posted by
Admin at
|
Share this post:
|
0 Comments
| | Posted by Supra (Sr. SAP Consultant) on Aug 5 at 11:14 PM | |
In IM Profile check the AUC per Source structure/assignment box.
------------------------------------------------------------------------------
Create AuC per source structure and source assignment
Use
When you set this indicator, the system creates a separate asset under construction for each source assignment in the
source structure, when you use this investment profile.
In this way, it is possible to settle debits, which are posted to the investment measure, separately by cost elements to various assets under construction.
You specify the source structure in the settlement profile.
-------------------------------------------------------------------------------------------
__.____._ ------------------------------------------------------------------------------
Create AuC per source structure and source assignment
Use
When you set this indicator, the system creates a separate asset under construction for each source assignment in the
source structure, when you use this investment profile.
In this way, it is possible to settle debits, which are posted to the investment measure, separately by cost elements to various assets under construction.
You specify the source structure in the settlement profile.
-------------------------------------------------------------------------------------------
Copyright © 2009 CEB Toolbox, Inc. and message author.
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this thread online
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion
Manage group e-mails
Create an FAQ on this topic
Tell us what you think
Unsubscribe from discussion