We have added search box. Key in SAP issue keyword to search
TopBottom

Announcement: wanna exchange links? contact me at sapchatroom@gmail.com.

[sap-hr] Personnel Cost Plannling for Vacant Position, ECC 6

Posted by Admin at
Share this post:
Ma.gnolia DiggIt! Del.icio.us Yahoo Furl Technorati Reddit

Posted by Muhammad Iqbal
on 07/20/2009 11:11:00 AM

Personnel Cost Plannling for Vacant Position,
I am implementing Personnel cost planning and simulation ECC 6, based on Payroll results and Projected pay for vacant position only, no issue in payroll results but i am not clear about the projected pay, vacant position based on wage element from IT 1015.
for testing purpose i have created one position and made it vacant through vacancy infotype, then i have created it 1015 record for that specific position and not on job. for 1015 i have created one sample wage element and assigned in it 1015. I am not using the planned compensation infotype (1005) although if i do then i am able to collect, any way without 1005 i am planning to collect data through second node in data collection specific to organization structure. i based on position object type, first issue is i am not sure which collection method i should use, i am able to see 4, two related to 1005, one for vacant position and forth one is through reference, i am expecting that vacant position method should work, that method is not working in my case and my wage type elements are not comming.
kindly advice
one more concern is while creating wage element through comp management, i could not see any place to assign wage element to cost items or symbolic account but assigned the cost elements while creating, is this enough ?
__.____._

Copyright © 2009 CEB Toolbox, Inc. and message author.

Toolbox.com
4343 N. Scottsdale Road
Suite 280
Scottsdale, AZ 85251

0 comments:

Post a Comment

T r a n s l a t e to your language