Announcement:
wanna exchange links? contact me at sapchatroom@gmail.com.
Posted by
Admin at
Thanks Ashutosh On Thu, Sep 30, 2010 at 3:40 AM, ashutosh_ashu via sap-log-mm < sap-log-mm@groups.ittoolbox.com> wrote: > Posted by ashutosh_ashu(singh) > on Sep 30 at 7:42 AM Yes > , > > It is right way to change the UOM becz without delete the PO you can't > change the same > > Ashutosh Singh > > Tatasteel > SAPMM > > On Thu, Sep 30, 2010 at 1:48 PM, Navin via sap-log-mm < > sap-log-mm@groups.ittoolbox.com> wrote: > > > Posted by Navin > > on Sep 30 at 4:17 AM Hi Experts, > > > > I have a requirement that is to change the base unit of measurement in > > material master. I have cleared all the stocks for current month and > > previous month precisely. I have cleared all the open PO's, i mean did GR > > > and IV. When i'm trying to change UOM in material master,system shows > still > > open PO existing,eventhough did GR and IV. If i delete the PO then i able > to > > change the UOM. Is it the right way to change the UOM. > > Please advise bit urgent. | __.____._ Copyright © 2010 Toolbox.com and message author. Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251 | | Related Content White Papers In the Spotlight _.____.__ |